Auteur :
Harris
Anthony,
D’Agostino
Anthony,
Litke-Farzaneh
Sara
...[et al.]
Collectivite Auteur :
Mathematica
Date de publication : 20/07/2020
Type : Rapport
Thème : Ecosystèmes terrestres
Couverture : Maroc
I. Introduction and background
A. Background
B. Objectives of the report
II. Overview of the compact and project
A. Overview of the Morocco Employability and Land Compact II
1. Overview of the Rural Land Activity
2. Overview of the Industrial Land Activity
B. Program logic
III. Literature review
A. Historical background on land governance in Morocco
1. Land governance
2. Rural land
3. Industrial land
B. Review of literature on rural and industrial land reform
1. Rural land
2. Industrial land
C. Contribution of the Land Productivity Evaluation to the literature
IV. Evaluation approach
A. Evaluation research questions
B. Evaluation design overview
V. Rural land activity evaluation design
A. Research questions and evaluation approaches
B. Impact evaluation
1. Evaluation design
2. Analysis plan
3. Outcomes and their anticipated time frame for realization
4. Power calculations and sample sizes
5. Data sources and data collection
C. Mixed-methods performance evaluation
1. Evaluation design
2. Data sources and data collection
3. Qualitative sampling approach
D. Economic rate of return analysis
E. Challenges and mitigation strategies
VI. Industrial land activity evaluation design
A. Research questions and evaluation approaches
B. Quantitative performance evaluation
1. Evaluation design
2. Outcomes and their anticipated time frame for realization
3. Analysis plan
4. Data sources and data collection
C. Qualitative performance evaluation
1. Evaluation design
2. Outcomes and their anticipated time frame for realization
3. Analysis plan
4. Data sources and data collection
D. Economic rate of return analysis
E. Challenges and mitigation strategies
VII. Administration
A. Summary of IRB requirements and clearances
B. Preparing data files for access, privacy, and documentation plan
C. Dissemination plan
D. Evaluation team roles and responsibilities
E. Evaluation timeline and reporting schedule